This year, we lowered the lake early in an effort to perform a few repairs to the dam. The scheduled repairs were completed last week.
I thank you again for your cooperation with lowering the lake early this year. One of the repairs was to an area that is underwater during normal water levels. It was important to get the water well below the repair area during the “warmer” weather so that the repair could be properly made.
Thank you
Mike