Hello – Please click on the links below for videos and maps of the dredging operation. We are heading down the home stretch for the current dredging operation. The dredging team is projecting to be completed by the end of October. Completion includes removal of all equipment from the lake and our property. The link titled “Choctaw Lake Dredge Progress 9-15-17” illustrates progress as of September 15th.
I have included a few current state videos of the containment pond. I am fascinated by the process of water/sediment removed through the same water returning to our lake; without all the muck! The containment pond is filling up with sediment from our lake. Please click on the 3 links to see the process of the water returning to our lake. I find them to be interesting. Links titled “Dredging Water Return Video, Dredge video Sept 27, and Dredging Containment Pond, shows the current state and process of the containment pond.