The drainage project along the south end of Itawamba is complete. A concrete headwall was installed to secure the drain pipes. The headwall will also prevent water from causing washout behind the pipes and under the road.
We appreciate the patience of those that live by this area. The project took much longer than we would like. We will grade and seed the work space in the spring.