We have reached the winter pool level. On 11/15, we lowered 3 of the baffles in the dam control box. This will prevent the lake from going lower than the current level.
The valve will remain open. The valve remains open so that the lake can recede towards the winter pool when the level increases during winter rain events.
Reach out with any questions about the lake-lowering process.
Mike Casimir 740-837-0833