The work for the walking path has begun. Crews are currently doing drainage work and cleanup work to prep for the installation of the path. Cleanup work includes stump grinding, removal of a large dead tree in the Soccer Field Park, and removal of concrete pads in Blackfoot Hollow. Excavation is scheduled to begin by the end of August.
Below is a rendering of the path. This design creates a path that is just under 1.1 miles long. The design allows provides the options to just do laps around the Lodge grounds or laps just around the Soccer Field park. We will keep you posted as the project progressess.